Venezuela Ohbaby Indoor Playground 300m² Pokiddo Design and Construction Project
- Share
- publisher
- Leon
- Issue Time
- Jun 23,2025
Summary
Discover how Pokiddo transformed 300m² in Caracas' premier mall into Ohbaby Monster Adventure Park - featuring ASTM-compliant interactive slides, vertically integrated party zones, and immersive monster themes. Learn how our turnkey design increased footfall by 37% post-launch.

Venezuela Ohbaby Indoor Playground 300m² Pokiddo Design and Construction Project
1. Project Snapshot
Location: Level 2, Centro Comercial Plaza Las Americas, Caracas, Venezuela
Scale: 300m² commercial indoor playground
Theme: "Little Monsters" immersive experience with 5 original characters
Key Features:
1.1 ASTM F1487-certified multi-level structures
1.2 Interactive projection slide system
1.3 Themed party room with exclusive access chute
1.4 Non toxic EVA foam safety flooring

2. Client Vision & Challenges
Ohbaby's operators sought to create Venezuela's first monster-themed adventure park targeting 3-12 year-olds. Key hurdles included:
2.1 Integrating a mezzanine party room with main play areas
2.2 Ensuring ADA-compliant flow during peak hours
2.3 Meeting ASTM impact attenuation standards
2.4 Completing installation within 5-month rent-free window


3. Design Innovation
Vertical Integration Strategy
Pokiddo's solution featured a 5m high net crawling tube connecting the mezzanine party zone to the rope playground area, enabling:
Exclusive access for party guests
One-way traffic flow (prevents re-entry)
40% faster guest rotation


Thematic Execution
Original monster characters were incorporated into:
Custom printed play panels
Interactive projection games
Themed reception counters


4. Safety Engineering
All structures exceeded ASTM F1292-18 standards with:
4.1 Dual-load carabiners on elevated walkways
4.2 30cm thick EVA foam flooring (critical fall height: 3m)
4.3 Emergency evacuation routes every 15m



5. Technical Installation
Phase | Timeline | Key Milestones | |||
Shipping | 30 days | FOB Ningbo to La Guaira | |||
Assembly | 20 days | On-site team + 1 Pokiddo engineer | |||
Certification | 15 days | ASTM/EN1176 compliance audit |